Download PDF of this page Print this page

 
Keith Company 1962 Building Construction
Construction of current building - 1962 Administration Building - 2017 Old Manufacturing Building
Structure of new building over old building New Building enclosing old building New Building finished - 40,000 sqft.
Aluminum Drop Bottom Furnace 120ft Pit furnace Auto Hydrogen Pusher Kiln
Bell Furnace Heat Treating Furnace Moly Hydrogen Pusher Kiln
         Atmosphere Retort Furnace
Roller Hearth Tunnel Kiln Atmosphere Retort Furnace
1700C Front Loading Fast Heat Furnace with Hood Bottom Loading Furnace for high temperature uniformity
Benchtop Furnace 1700C Front Loading Fast Heat Furnace with Hood Bottom Loading Furnace for high temperature uniformity
Bottom Drop Furnace for Solution Heat Treating Aluminum Bottom Drop Furnace with two quench tanks
Bottom Drop Furnace for Solution Heat Treating Aluminum Bottom Drop Furnace with two quench tanks Indirect gas-fired Aluminum Heat Treat Furnace for AMS2750E with quench and rinse tank