Keith Company 1962 Building Construction Construction of current building - 1962
Keith Company headquarter in Pico Rivera Administration Building - 2017
Building Old Old Manufacturing Building
Building Start of Structure Structure of new building over old building
Building-Old and New New Building enclosing old building
Building-finished-September-2017 New Building finished - 40,000 sqft.
aluminum drop bottom Aluminum Drop Bottom Furnace
120 ft pit furnace 120ft Pit furnace
auto hydrogen push Auto Hydrogen Pusher Kiln
bell furnaces Bell Furnace
heat treating Heat Treating Furnace
moly hydrogen pusher Moly Hydrogen Pusher Kiln
roller hearth Roller Hearth
tunnel kiln Tunnel Kiln
Atmosphere Retort Furnace Atmosphere Retort Furnace
Benchtop Furnace Benchtop Furnace
1700C Front Loading Fast Heat Furnace with Hood 1700C Front Loading Fast Heat Furnace with Hood
Bottom Loading Furnace for high temperature uniformity Bottom Loading Furnace for high temperature uniformity
K-12-12-20-Dual Chamber Furnace with Atmosphere Dual Chamber Furnace with Automatically Controlled Inert Protective Gas Atmosphere
Bottom Loading Furnace with Pusher Bottom Loading Furnace with Pusher
Chemical Vapor Deposition Furnace for Nano Particle Production Chemical Vapor Deposition Furnace for Nano Particle Production
Bottom Drop Furnace for Solution Heat Treating Aluminum Bottom Drop Furnace for Solution Heat Treating Aluminum
Bottom Drop Furnace with two quench tanks Bottom Drop Furnace with two quench tanks
Indirect-gas-fired-aluminum-heat-treat-furnace-for-AMS-2750-AMS-2770-with-quench-and-rinse-tank Indirect gas-fired Aluminum Heat Treat Furnace for AMS2750E with quench and rinse tank